S2 Scheduled Maintenance Set

In the following video instructions, various maintenance tasks are explained. We recommend doing each job at least after operating the system for three months or sooner as needed or described below. The required materials are all available in the maintenance package Sintratec S2 Scheduled Maintenance Set (PRO1354) and can be ordered directly from [email protected].

Replacing Wire Rope

Expected work time: 10 minutes

When to do this?

  • If the rope is damaged or cracks are visible at one point
  • After three months

Tools

  • Screwdriver Torx 15, long shaft
  • Screwdriver Torx 20
  • Ruler

Used Materials

  • 1x PRO1244

Tip

  • Use the schematic you can find below the video on this page
  • Perform this task when replacing the V-Wheels, Coater Sliders or Coater Motor Felt

Distance = 43mm

Replacing V-Wheel

Expected work time: 5 minutes

When to do this?

  • If the coater is not moving freely
  • After three months

Tools

  • Screwdriver Torx 20
  • Screwdriver Torx 25
  • Ruler
  • Regular Glass Cleaner
  • Rag

Used Materials

  • 5x PRO1243

Tip

  • Perform this task when replacing the Coater Sliders, Coater Motor Felt or Wire rope

Replacing Coater Sliders

Expected work time: 5 minutes

When to do this?

  • When the coater blade can no longer be adjusted to the needed 2mm height
  • After three months

Tools

  • Screwdriver Torx 20
  • Hex Allen Key 6mm
  • Ruler

Used Materials

  • 20x PRO1228

Tip

  • Perform this task when replacing the V-Wheels, Coater Motor Felt or Wire Rope

Replacing Coater Motor Felt

Expected work time: 5 minutes

When to do this?

  • When replacing the V-Wheels
  • After three months

Tools

  • Screwdriver Torx 20
  • Screwdriver Torx 8
  • Ruler
  • Vacuum cleaner

Used Materials

  • 1x PRO1242

Tip

  • Perform this task when replacing the V-Wheels, Coater Sliders or Wire Rope

Replacing Reservoir Gaskets

Expected work time: 5 minutes for each platform

When to do this?

  • If you see any leaks while filling in the powder
  • When powder is missing along the edge of the platform after printing
  • After three months

Tools

  • Screwdriver Torx 25
  • Vacuum cleaner

Used Materials

  • 1x PRO1226 (for one platform)

Tip

  • Start the loading process with a shallow print, and aboard after the platforms are in position

Replacing Build Gaskets

Expected work time: 10 minutes

When to do this?

  • If you see any leaks while filling in the powder
  • When powder is missing along the edge of the platform after printing
  • After three months

Tools

  • Screwdriver Torx 25
  • Vacuum cleaner

Used Materials

  • 1x PRO1227

Tip

  • Start the loading process, and aboard after the platforms are in position

Replacing Filter

Expected work time: 1 minute

When to do this?

  • When the filter is clogged
  • When the filter is very dirty
  • When the filter is damaged
  • After three months

Tools

  • Vacuum cleaner

Used Materials

  • 1x PRO1179
  • 1x PRO1180

Tip

  • There is an Filter upgrade available

Replacing Laser/ IR Glass

Expected work time: 1 minute

When to do this?

  • If the glass has visible defects
  • When the glass is dirty and can`t be cleaned with IPA (isopropanol alcohol)
  • If the coating from the IR glass is peeling off
  • After three months

Tools

  • Vacuum cleaner
  • Rubber gloves

Used Materials

  • 2x PRO1229 (laser glass)
  • 1x PRO1233 (IR glass)

Tip

  • Clean out the drawer with a vacuum cleaner when the glasses are removed